PR MEPS Map

MEP Contractor ISO 9001:2015


And ISO 14001:2015

PR MEP Services Contractor – Specializes in offering turnkey solutions in the field of Electro Mechanical works covering:
• Electrical – Lighting & Power System
• Electrical – Low Current System
• Drainage System
• Water Supply System
• HVAC System
• Fire Protection System
• Fire Water Tanks

Our Comprehensive services on MEP works cover Design from strong engineering fundamentals by our specialized and highly trained designers, Project planning, Project execution by a disciplined and trained work force aimed at achieving quality installation meeting best industry standards, commissioning and meticulous testing & balancing of the entire MEP works to achieve the design intent from a single source.

Professional & Specialized MEP Contractor in Gurgaon, Delhi NCR

Contact us