PR MEPS Map

MEP Contractor ISO 9001:2015


And ISO 14001:2015

HVAC - Ducting - Water Chilled Plant - STP - WTP etc. Project contractor in Gurgaon, Delhi.

image

HVAC Project contractor in Gurgaon, Delhi.
Ducting work Project contractor in Gurgaon, Delhi.
Water Cilled Plant Project contractor in Gurgaon, Delhi.

Ducting Work Contract image

HVAC maintenance/ AMC contractor in Gurgaon, Delhi.
Ducting work maintenance/ AMC contractor in Gurgaon, Delhi.
Water Cilled Plant maintenance/ AMC contractor in Gurgaon, Delhi.

Ducting Work Contract image-2

MEP- Mechanical Work (HVAC, Ducting, Chilled Water Plant etc.) Contractor in Gurgaon, Delhi, Delhi NCR, India

PR MEP is Mechanical Work Contractor in Gurgaon. MEP Mechanical Work Contractor in Delhi. MEP Mechanical Work Contractor in Delhi NCR. MEP Mechanical Work Contractor in India.

Our services in HVAC covers from the Decorative Split/ Ducted split segment to high end chilled water and district cooling system. Design review process covers the parameters considered during the tender design stage from the point of optimizing the capacity, choosing the right system and effectively designing and integrating system components for achieving overall system efficiency. Ventilation system to maintain proper IAQ (Indoor Air Quality) are studied at the design stage to ensure occupant comfort and safety meeting industry standards and authority requirements. Our association with reputed manufacturers / suppliers to offer wide range of equipment such as Ducted Split AC units, Packaging units, Air Handling units, Water /Air cooled chiller combined with our engineering expertise on system design and quality installation ensures customer requirements are met.

"PR MEPS" offers a complete range of Mechanical services include Design, Build, Installation & Maintenance for Commercial, Industrial & Residential Projects. Ducting Work Contract image-2

Chilled water system, chiller plants, cooling towers, FAU, AHU, FCU Supplier and Work Services Provider in Gurgaon, Delhi, Delhi NCR, India

Chilled water system Supplier and Work Contractor in Gurgaon, Delhi, Delhi NCR, India. Chiller Plant system Supplier and Work Contractor in Gurgaon, Delhi, Delhi NCR, India. Cooling Tower system Supplier and Work Contractor in Gurgaon, Delhi, Delhi NCR, India. FAU system Supplier and Work Contractor in Gurgaon, Delhi, Delhi NCR, India. AHU system Supplier and Work Contractor in Gurgaon, Delhi, Delhi NCR, India. FCU Supplier and Work Contractor in Gurgaon, Delhi, Delhi NCR, India.

Mechanical Specialization by PR MEP Service Contractor

PR MEP Mechanical Specialization by PR MEP Service Contractor.

  • • Heating, Ventilation & Air Conditioning (HVAC) System
  • • All type of Air Conditioning System ( Centralized, Wall-Mounted, Split System, CC, Ducted, PI Duct)
  • • Chilled water system, chiller plants, cooling towers, FAU, AHU, FCU
  • • Refrigeration and low temperature projects
  • • GI/ PI Duct Works & Installation
  • • Ventilation Systems
  • • Inspection, Surveys & Reports of Existing Installations


We work with you from start to finish of your project, including:
•Site Survey    •Estimation    •Design    •Installation    •Commissioning    •Maintenance

HVAC_Work_image

Professional & Specialized MEP Contractor in Gurgaon, Delhi NCR

Contact us