PR MEPS Map

MEP Contractor ISO 9001:2015


And ISO 14001:2015

image image

Plumbing Services

Water Supply essential for life and a proper drainage system is carried out by us from proper engineering calculations and adherence to international and local authority standards. End user requirement and consumption pattern is studied carefully to ensure adequate availability and distribution of water. Disposal of waste is designed from a viewpoint of quick & efficient discharge into the common mains and odourless environment.

PR MEP offers a complete range of plumbing, draingae and sanitary services include Design, Build, Installation & Maintenance for Commercial, Industrial & Residential Projects.

Specialization

  • • Design & Installation of plumbing, drainage and sanitary systems
  • • Pump Room & Tank Supply and Installation
  • • Complete PVC, CPVC, UPVC, PPR, GI, MS Piping Works
  • • Sanitary wares fixing
  • • Sewage Treatment Plants
  • • Water Treatment Plants
  • • RO Plants
  • • Potable Water Booster Systems
  • • Supply, Installation, Testing and Commissioning


We work with you from start to finish of your project, including:
•Site Survey    •Estimation    •Design    •Installation    •Commissioning    •Maintenance





Professional & Specialized MEP Contractor in Gurgaon, Delhi NCR

Contact us