Plumbing & Fluid Flow Calculator

Optimised Units: mm, L/min, kg/cm², feet

Core Flow Rate & Velocity Relations

Calculate Resulting Velocity (v)

Formula: v = Q / (0.02112 × d²)

Velocity (v): -- ft/s

Calculate Target Diameter (d)

Formula: d = 6.88 × √(Q / v_target)

Diameter (d): -- mm

Empirical Sizing & Head Loss

Hazen-Williams Friction Loss

Head Loss: -- ft H₂O
Pressure Drop: -- kg/cm²

Smooth Pipe Quick Drop Shortcut

Using flow rate directly for 20°C Water

Pressure Drop: -- kg/cm²

Advanced Fluid Dynamics & Swamee-Jain

Comprehensive System Pressure Drop

Fittings Inventory (Equivalent Length Shortcut)

Calculated Velocity (v): -- ft/s

Reynolds Number (Re): -- (--)

Swamee-Jain Friction Factor (f): --

Equivalent Length Added: -- feet

Total System Pressure Drop (ΔP): -- kg/cm²

Real-World Operating Efficiency Analyzer

Calculate Actual System Efficiency (%)

Back-calculates true system efficiency using your current physical setup

Fittings Inventory (Accurate Friction Tracking)

Motor & Pump Power Requirements

Calculate Required Motor Horsepower (HP)

Hydraulic Power Formula scaled for L/min and Feet of Head

(Get this value from Tab B or C)
(e.g., enter 35 for 35% efficiency)

Total Dynamic Head (TDH): -- feet

True Continuous Winding Load: -- HP / -- kW

Recommended Motor Size: --

Plumbing Technical Design & Math Suite

Interactive Engineering Calculators (Metric Reference)

1. Pipe Hydraulics & Friction Loss

(e.g., standard DN25 pipe internal is ~22-26mm)
Water Velocity: -
Velocity Status: -
Friction Loss (Total Run): -

2. Static Pressure & Elevation Head

Resulting Head Profile: -

3. Volumetric Weight & Expansion Sizing

(Include water heater capacity + total piping volume)
(e.g., 15°C incoming supply heating up to 55°C = 40°C Rise)
Total Water Weight (Static): -
Thermal Expansion Volume: -
Suggested Expansion Tank Size: -

4. Drainage Slope & Load Planning

Max Permitted Fixture Units (DU): -
Max Flow Capacity (Half-Full): -
Minimum Practical Velocity: ≥ 0.6 m/s (Self-Scouring)